Installation Requirements: The concrete pressure testing machine should be installed in a clean, dry room with uniform temperature, free from vibration and corrosive gases. The foundation should be firm and reliable. During installation, the foundation should be prepared according to the foundation drawing. After the machine is in place, secure it with φ12 expansion bolts, ensuring the machine is roughly level. The testing machine should be installed horizontally on a stable foundation in an environment free from corrosive media and vibration. The power supply voltage fluctuation should not exceed ±10% of the rated voltage.
Commissioning Procedures: Commissioning includes steps such as oil filling, electrical connection, and starting the oil pump to vent air. Before use, check the oil level in the tank, fasteners, and electrical grounding.